A few years ago we were tasked with strengthening the abutments on a crucial bridge that spans the river Nethy in Nethybridge. This was a great project to be involved with and took considerable planning. The original concrete abutments had be damages over the years due to undercutting erosion from the fast flowing river. This work was essential to mitigate any future damage that would potentially condemn the entire structure. Work got under way by diverting the river to allow access to the foundations, then shuttering was constructed and heavily reinforced to allow us to pour the large quantity of concrete. The client was very happy with the finish, another high quality result from the ACT team.