Andy Taylor

Glenfinnan Bridge repair

Bridge Restoration at Glenfinnan for Forestry and Land Scotland March 2025 We are pleased to have completed vital restoration work on a section of the Glenfinnan bridge, ensuring continued safe passage along the Cape Wrath Trail. Located on the eastern side of Loch Shiel, the bridge spans the River Callop, serving as an essential crossing for hikers and outdoor enthusiasts…

Torlundy Bridge replacement

Footbridge Replacement Near Torlundy for Forestry and Land Scotland Feb 2025 We’re proud to have completed the replacement of a 12-metre footbridge near Torlundy, enhancing accessibility for horses, mountain bikers, and pedestrians alike. Designed to integrate seamlessly with the surrounding landscape, this sturdy new crossing is built to support both recreational and land management needs. The bridge structure consists of…

Rum Hill track upgrade

Main hill Track from Kinloch to Harris/Kilmory | January 2025. Commissioned by NatureScot, the team was tasked with upgrading the main hill track leading from Kinloch village into the wilderness of Rum. As the sole access route connecting the island’s core, the track provides a vital link for staff, researchers, and visitors, ensuring safe and reliable passage to all corners of…

Strontian Bridge replacement

Footbridge Replacement: A Testament to Dedication and Ingenuity In the heart of a challenging location, our team recently completed the replacement of a wooden beam footbridge—a project that tested both our resilience and resourcefulness. Accessing the site was no easy feat, requiring a 2km round trip with power barrows to transport materials. The beams, too large for conventional methods, were…

Rum Bridges.

Three Bridges, Kinloch, Rum | March 2025. NatureScot commissioned the team to construct three bridges along the Corie Dubh path on the Isle of Rum. Originally, this path served as the construction access road to the header dam for the island’s hydro system. Over time, however, it transitioned into a less formal route with rudimentary burn crossings. To enhance safety…

Derry Dam Bridge repair Mar Lodge

Derry Dam Bridge Repair and Adjustment, Mar Lodge. Our Bridge and Boardwalk team successfully completed a complex bridge relocation and abutment rebuild for the National Trust for Scotland. The Derry Dam bridge originally built in 1959 had been closed for ten years due to erosion of the supporting abutments and river bank from floods. The projects scope involved meticulous planning…

Abriachan Bridge replacement and path upgrade.

Abriachan Bridge replacement and path up upgrade. Our Bridge and boardwalk team recently completed a demanding project to replace two aging footbridges at Abriachan, located on the picturesque side of Loch Ness. The remote and rugged terrain posed significant logistical challenges, necessitating the careful transport of all materials by hand and power barrows. Despite these obstacles, the team successfully installed…

Carpark expansion and upgrade Strone Hill Dalmally.

Carpark expansion and upgrade Strone Hill Dalmally. As part of a larger project the team recently completed the Strone hill and Glen lochy carparks for Forestry and Land Scotland. Both these sites presented unique challenges, as the new spaces were constructed over large established peat bogs. Utilising unique construction standards, we were able to ensure the stability and longevity of…

Carpark Installation Bridge of Orchy

Innovative Carpark Installation for Forestry and Land Scotland. In an ambitious undertaking, our team has successfully completed a comprehensive carpark installation for Forestry and Land Scotland, spanning three distinct sites around the Bridge of Orchy and Tyndrum area. This project was not just about adding parking spaces; it was about creating a sustainable infrastructure that harmonises with the natural environment.…